What we do, in detail

Four services, all ending in an inspection report or a set of test results.

Program 01 · Inspected, then energised

Electrical installation

The regulations decide the work: circuit protection, earthing, cable sizing and separation are not matters of preference. What varies is whether a contractor books the inspection or leaves it as somebody else's problem. We book it, correct anything it records, have it re-inspected, and hand you the report before the installation is used.

  • Per project
  • Homes and businesses
  • Written quote
  • Inspection access

Start this program

Step 1 · Survey

Supply, load and existing condition.

Step 2 · Quote

Items and what is excluded.

Step 3 · Install

To the regulations in force.

Step 4 · Inspection

By an approved body, then the report.

Step 1 · Plan

Points, routes and cabinet position.

Step 2 · Install

Power and data properly separated.

Step 3 · Terminate

Patched and labelled.

Step 4 · Test

Results handed over.

Program 02 · Tested, not assumed

Data and network cabling

Cabling that looks right and tests badly is the most common fault we meet, and it is invisible until a connection drops under load months later. Every run is tested and the results are handed over, because a cabling job without test results is an assertion. We also keep data separated from power properly rather than sharing a convenient route.

  • Per project
  • Offices and businesses
  • Written quote
  • Routes accessible

Start this program

Program 03 · Supplied and commissioned

IT and communications equipment

We supply the hardware as well as installing it, which means the statutory two-year guarantee of conformity applies to what we sell you, alongside whatever the manufacturer offers. We will also say when existing equipment is worth keeping: replacing a switch that tests fine to tidy a quote is not an upgrade, it is a sale.

  • Per project
  • Homes and businesses
  • Written quote
  • 2-yr guarantee

Start this program

Step 1 · Needs

What the work actually requires.

Step 2 · Specify

Quoted, with alternatives.

Step 3 · Install

Configured and commissioned.

Step 4 · Hand over

Documented, with warranties.

Step 1 · Read the report

Item by item, with you.

Step 2 · Quote

What each item requires.

Step 3 · Correct

Non-conformities cleared.

Step 4 · Re-inspect

Clean report handed over.

Program 04 · Findings in writing

Testing and remedial work

A failed inspection report is a list, not a verdict, and most items on it are straightforward once someone reads it properly. We work through the non-conformities, arrange the re-inspection and hand over the clean report. Where a fault is in the supply rather than the installation we say so, because that belongs to the network operator.

  • Per visit
  • Owners and landlords
  • Written findings
  • Re-inspection booked

Start this program

Got electrical or IT work to price?

A free site visit and a written quotation, with the inspection shown separately.